|
Installing the water line from the first well. |
Glen enjoying the snow. |
|
The master at work. |
The first well in place with the trench backfilled. |
|
Glen taking a turn with the excavator. |
The second stretch of trench with the pipe from the main well. |
|
The location of the second well. |
Digging to bedrock. |
|
Placing the top tile and cover. |
Ready for backfill. |
|
The tiles in place. |
Paul checking the water level. |
|
Digging more trench and placing the water lines. |
More trenching. |
|
Still more trenching. The water line will be nearly 1200 feet long. |
The trench from the hill to the tool shed. |
|
The trench toward the house. |