Here are a few pictures of the water supplies being installed.

BACK TO HOME PAGE

Installing the water line from the first well.

Glen enjoying the snow.

The master at work.

The first well in place with the trench backfilled.

Glen taking a turn with the excavator.

The second stretch of trench with the pipe from the main well.

The location of the second well.

Digging to bedrock.

Placing the top tile and cover.

Ready for backfill.

The tiles in place.

Paul checking the water level.

Digging more trench and placing the water lines.

More trenching.

Still more trenching. The water line will be nearly 1200 feet long.

The trench from the hill to the tool shed.

The trench toward the house.


HOME | TOP

Last updated on 08/18/07